Back to PRODUCTS

Page 1 ctpoint.gif (822 bytes) Page 2 ctpoint.gif (822 bytes) Page 3

image002.gif (3618 bytes)

 EZ-Tread and EZ-Tread Lite Cross Bar Locations
And Installation Instructions for Retro-Fitting Existing Walkways

image004.gif (3373 bytes)

Typical Steel Structure and Attaching Method of Stringer (by Others)

image006.gif (2473 bytes)

 

  • Each 4' length comes with four (4) fiberglass heel clamping brackets and four (4) stainless steel nuts, bolts, and washers for through bolting the stringer.

  • Special walkway widths are available. For dock decking, both EZ-Tread and EZ-Tread Lite are available to twenty (20) feet in length.

  • Place the heel clamp between support bars, mark the bolt hole location, drill a 1/4" hole through the stringer and install and tighten the bolt. Be sure a washer is under both the bolt head and the nut. Check periodically for tightness.

  • Follow manufacturer's recommendations when using power tools.

  • Not all walkways are made as shown due to manufacturing differences. Consult Cortrol for variations and we will adapt installation hardware as needed. Special pricing may be required.

  • EZ-Tread is not recommended for walkways that flood.

  • Sure-Grip is not recommended for bare feet.


Page 1
ctpoint.gif (822 bytes) Page 2 ctpoint.gif (822 bytes) Page 3